When volatility is a deterministic function of time,
$$dX_t = \sigma(t)\,dW_t$$the terminal value $X_T$ is normally distributed with variance equal to the total integrated variance $\int_0^T \sigma(t)^2\,dt$. Two volatility schedules with the same integral share the exact same terminal distribution while following very different intermediate paths.
Why only integrated variance enters the terminal law
Because the increments over non-overlapping intervals are independent Gaussians, $X_T$ is itself Gaussian with mean $x_0$. By the Itô isometry [1, 2], its variance at any time $t$ is:
$$\operatorname{Var}[X_t] = \int_0^t \sigma(s)^2\,ds$$European payoffs depend only on the marginal law of $X_T$, so only $\int_0^T \sigma(t)^2\,dt$ matters—equivalently, the Black–Scholes log-asset with deterministic volatility prices European options purely from root-mean-square volatility. Path-dependent payoffs break that invariance: barriers are crossed earlier when variance is front-loaded, and averages weight early observations more heavily.
Comparing constant volatility $\sigma(t) = 1$ with a rising profile $\sigma(t) = \sqrt{2t}$ illustrates the contrast, since $\int_0^1 1\,dt = \int_0^1 2t\,dt = 1$:
| Schedule | Exact $\operatorname{Var}[X_{0.5}]$ | Simulated $\operatorname{Var}[X_{0.5}]$ | Exact $\operatorname{Var}[X_1]$ | Simulated $\operatorname{Var}[X_1]$ |
|---|---|---|---|---|
| Flat, $\sigma(t) = 1$ | $0.50$ | $\approx 0.50$ | $1.00$ | $1.00$ |
| Rising, $\sigma(t) = \sqrt{2t}$ | $0.25$ | $\approx 0.24$ | $1.00$ | $0.99$ |
The $1\%$ shortfall on the rising schedule at $T = 1$ comes from Euler’s left-endpoint quadrature of $\int_0^1 2t\,dt$ on the time grid, which slightly underestimates an increasing integrand.


Run this in sItô
Open sItô with this model pre-loaded to inspect the path distribution, summary statistics, and parameter sensitivities—or change any setting and rerun:
- Open flat σ(t) = 1 in sItô ↗ — variance grows linearly, reaching $0.50$ at $t = 0.5$ and $1.00$ at $t = 1$.
- Open rising σ(t) = √(2t) in sItô ↗ — starts slower ($\operatorname{Var}[X_{0.5}] \approx 0.24$) and catches up to $0.99$ by $t = 1$.
How time-dependent coefficients t and horizon T are written is detailed in the sItô Reference, and their compilation in Compiling parametric SDEs into fast Monte Carlo simulations.
Related notes: The Itô integral of W dW · Asian call by Monte Carlo · Barrier options on a grid