Because a simulated trajectory can cross an upper barrier $B$ and drift back below it between consecutive grid dates, discrete monitoring undercounts barrier hits and overprices knock-out options. Shifting the grid barrier inward by the Broadie–Glasserman–Kou factor $e^{-0.5826\,\sigma\sqrt{\Delta}}$ removes that $O(\sqrt{\Delta})$ overpricing on a coarse grid.
In a concrete test case—an up-and-out call with $S_0 = K = 100$, upper barrier $B = 130$, $r = 3\%$, $\sigma = 20\%$, and maturity $T = 1$—the continuous-monitoring price is $3.203$, whereas a $100$-step grid prices it at $3.55$ (roughly $11\%$ high). Lowering the grid barrier to $B\,e^{-0.5826\,\sigma\sqrt{\Delta}} = 128.49$ recovers the continuous value on the same $100$ steps.
Size of the discrete-monitoring bias
Broadie, Glasserman, and Kou [1] showed that monitoring an upper barrier $B$ at uniform step size $\Delta$ is equivalent, up to $O(\Delta)$, to continuous monitoring of a higher barrier shifted outward to $B\,e^{0.5826\,\sigma\sqrt{\Delta}}$. With $\Delta = 0.01$ and $\sigma = 0.20$, this shift is $1.2\%$, moving the effective barrier from $130$ to $131.5$. Substituting that shifted barrier into the Reiner–Rubinstein closed-form formula for a continuous up-and-out call matches the discrete-grid prices:
| Monitoring setup | Hit probability | Up-and-out call |
|---|---|---|
| Continuous monitoring (closed form) | 0.2023 | 3.203 |
| $100$-step grid ($\Delta = 0.01$) | 0.186 | 3.55 |
| $10^3$-step grid ($\Delta = 10^{-3}$) | 0.196 | 3.32 |
| Closed form at $B\,e^{0.5826\,\sigma\sqrt{\Delta}}$, $100$ / $10^3$ steps | 0.183 / 0.196 | 3.55 / 3.31 |
| $100$-step grid with shifted barrier $128.49$ | 0.203 | 3.20 |
Because the bias shrinks only at rate $\sqrt{\Delta}$, increasing the step count tenfold reduces the pricing error from $0.35$ to $0.12$. Applying the inverse shift $B\,e^{-0.5826\,\sigma\sqrt{\Delta}}$ removes the bias at zero additional computational cost [2].


Run this in sItô
Open sItô with this model pre-loaded to inspect the path distribution, summary statistics, and parameter sensitivities—or change any setting and rerun:
- Open barrier 130, $100$ steps in sItô ↗
- Open barrier 130, $10^3$ steps ($10^3$ paths) in sItô ↗
- Open corrected barrier 128.49, $100$ steps in sItô ↗
| Simulated run | Hit probability | Call price (SE) |
|---|---|---|
| Barrier 130, $100$ steps | 18.6% | 3.56 (0.07) |
| Barrier 130, $10^3$ steps ($10^3$ paths) | 20% | 3.1 (0.2) |
| Barrier 128.49, $100$ steps | 20.4% | 3.24 (0.06) |
Discrete fixings versus continuous integrals
Grid spacing produces an analogous discrepancy in path integrals. In the specification language, Integral(x) evaluates the right-endpoint Riemann sum $\sum_{n=1}^{N} x_n\,\Delta$, which equals the average over $N$ discrete fixings at $t_1, \dots, t_N$ (scaled by $T$) rather than the continuous integral $\int_0^T x_t\,dt$. In the deterministic test case ($\sigma = 0$, $x_0 = 100$, $r = 3\%$, $T = 1$, $N = 100$):
| Rule | Average |
|---|---|
| Left-endpoint sum | 101.500 |
| Exact continuous integral | 101.515 |
Right-endpoint sum (Integral(x)) | 101.530 |
- Open deterministic path integral in sItô ↗ (returns $101.53$).
When a contract specifies discrete monitoring dates such as daily fixings, the simulation grid matches the contract and requires no adjustment. For continuously monitored barriers, either apply the Broadie–Glasserman–Kou barrier shift or sample intra-step crossings using the Brownian bridge law. The underlying discretization schemes are covered in Compiling parametric SDEs into fast Monte Carlo simulations.